Renewable energy in Ethiopia

Ethiopia has 10.1 GW of operating renewable capacity in the data, across 24 plants. Hydropower is the largest source at 9.2 GW (91% of the total). That is 100% of the 10.1 GW of operating power capacity of all kinds that the same tracker lists for Ethiopia (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 8.0 GW, which is 79% of today's operating renewable capacity. A further 2.2 GW is under construction and 8.8 GW is announced or in pre-construction.

Operating
10.1 GW24 plants
Share of capacity in this dataset
100%of 10.1 GW operating, all kinds
Started 2015 to 2025
8.0 GWoperating plants
Pipeline
11.0 GW2.2 GW building, 8.8 GW announced

Capacity by technology

Renewable capacity in Ethiopia by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV2 MW1<0.1%02.4 GW
Onshore wind664 MW46.6%0736 MW
Hydropower9.2 GW1391%2.2 GW5.3 GW
Geothermal000.0%70 MW330 MW
Bioenergy268 MW62.6%00
All renewables10.1 GW24100%2.2 GW8.8 GW

Of the operating solar, 2 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW5.0 GW10.0 GW19901995200020052010201520202025
Solar PVOnshore windHydropowerBioenergy
Show the figures as a table
Operating renewable capacity in Ethiopia by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
200173 MW000073 MW000
2004184 MW0000184 MW000
2009300 MW0000300 MW000
2010880 MW0000880 MW000
201197 MW000097 MW000
201251 MW0051 MW00000
2013151 MW00120 MW00031 MW0
20152.0 GW00153 MW01,870 MW000
2017180 MW00120 MW00060 MW0
2018101 MW000000101 MW0
2020254 MW0000254 MW000
202145 MW00000045 MW0
2022120 MW00120 MW00000
20242 MW2 MW0000000
20255.3 GW00100 MW05,150 MW000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 31 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2025 with 5.3 GW.

Largest renewable plants in Ethiopia

The ten largest operating renewable plants in Ethiopia.
#PlantTechnologyCapacityStatusStarted
1Grand Ethiopian Renaissance hydroelectric plantHydropower5.2 GWOperating2025
2Gilgel Gibe III hydroelectric plantHydropower1.9 GWOperating2015
3Beles hydroelectric plantHydropower460 MWOperating2010
4Gilgel Gibe II hydroelectric plantHydropower420 MWOperating2010
5Tekeze I hydroelectric plantHydropower300 MWOperating2009
6Genale Dawa III hydroelectric plantHydropower254 MWOperating2020
7Aysha wind farmOnshore wind240 MWOperating2017
8Adama wind farmOnshore wind204 MWOperating2012
9Gilgel Gibe I hydroelectric plantHydropower184 MWOperating2004
10Melka Wakena hydroelectric plantHydropower153 MWOperating1988

Largest in the pipeline

The five largest renewable projects under construction or announced in Ethiopia.
#PlantTechnologyCapacityStatusStarted
1Koysha hydroelectric plantHydropower2.2 GWUnder constructionnot recorded
2Ethiopia Roadmap (Masdar) solar farmSolar PV2.0 GWAnnouncednot recorded
3Tams hydroelectric plantHydropower2.0 GWAnnouncednot recorded
4Karadobi hydroelectric plantHydropower1.6 GWAnnouncednot recorded
5Aysha wind farmOnshore wind452 MWAnnouncednot recorded

Questions

How much renewable energy capacity does Ethiopia have?

Ethiopia has 10.1 GW of operating renewable capacity across 24 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Ethiopia?

Hydropower, with 9.2 GW operating, which is 91% of Ethiopia's operating renewable capacity in the data.

What share of Ethiopia's power capacity is renewable?

100% of the operating capacity in this dataset (10.1 GW of 10.1 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Ethiopia building renewables?

Operating plants that started from 2015 to 2025 total 8.0 GW, and the biggest single year in the data is 2025 with 5.3 GW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Ethiopia?

Grand Ethiopian Renaissance hydroelectric plant, a hydropower plant of 5.2 GW, which started operating in 2025.

How much renewable capacity is being built or planned in Ethiopia?

2.2 GW is under construction and 8.8 GW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.