Egypt has 9.5 GW of operating renewable capacity in the data, across 90 plants. Solar PV is the largest source at 3.5 GW (37% of the total). That is 15% of the 64.0 GW of operating power capacity of all kinds that the same tracker lists for Egypt (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 6.0 GW, which is 64% of today's operating renewable capacity. A further 19.6 GW is under construction and 79.8 GW is announced or in pre-construction.
- Operating
- 9.5 GW90 plants
- Share of capacity in this dataset
- 15%of 64.0 GW operating, all kinds
- Started 2015 to 2025
- 6.0 GWoperating plants
- Pipeline
- 99.3 GW19.6 GW building, 79.8 GW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 3.5 GW | 76 | 37% | 5.9 GW | 45.2 GW |
| Concentrated solar | 20 MW | 1 | 0.2% | 100 MW | 0 |
| Onshore wind | 3.0 GW | 6 | 32% | 3.2 GW | 33.4 GW |
| Hydropower | 2.9 GW | 6 | 30% | 0 | 0 |
| Bioenergy | 45 MW | 1 | 0.5% | 153 MW | 100 MW |
| Wind (type not stated) | 0 | 0 | 0.0% | 10.2 GW | 1.1 GW |
| All renewables | 9.5 GW | 90 | 100% | 19.6 GW | 79.8 GW |
Of the operating solar, 228 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 1993 | 86 MW | 0 | 0 | 0 | 0 | 86 MW | 0 | 0 | 0 |
| 2000 | 30 MW | 0 | 0 | 30 MW | 0 | 0 | 0 | 0 | 0 |
| 2001 | 33 MW | 0 | 0 | 33 MW | 0 | 0 | 0 | 0 | 0 |
| 2003 | 30 MW | 0 | 0 | 30 MW | 0 | 0 | 0 | 0 | 0 |
| 2004 | 47 MW | 0 | 0 | 47 MW | 0 | 0 | 0 | 0 | 0 |
| 2006 | 85 MW | 0 | 0 | 85 MW | 0 | 0 | 0 | 0 | 0 |
| 2008 | 144 MW | 0 | 0 | 80 MW | 0 | 64 MW | 0 | 0 | 0 |
| 2009 | 120 MW | 0 | 0 | 120 MW | 0 | 0 | 0 | 0 | 0 |
| 2011 | 20 MW | 0 | 20 MW | 0 | 0 | 0 | 0 | 0 | 0 |
| 2017 | 54 MW | 54 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2018 | 759 MW | 147 MW | 0 | 580 MW | 0 | 32 MW | 0 | 0 | 0 |
| 2019 | 2.1 GW | 1,814 MW | 0 | 263 MW | 0 | 0 | 0 | 0 | 0 |
| 2020 | 50 MW | 50 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2021 | 267 MW | 15 MW | 0 | 252 MW | 0 | 0 | 0 | 0 | 0 |
| 2022 | 177 MW | 177 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2023 | 28 MW | 28 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2024 | 1.5 GW | 1,220 MW | 0 | 252 MW | 0 | 0 | 0 | 0 | 0 |
| 2025 | 1.2 GW | 7 MW | 0 | 1,152 MW | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 186 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1967 with 2.1 GW.
Largest renewable plants in Egypt
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Aswan High Dam hydroelectric plant | Hydropower | 2.1 GW | Operating | 1967 |
| 2 | Ras Ghareb wind farm | Onshore wind | 913 MW | Operating | 2019 |
| 3 | Gulf Of Ziet Wind Complex | Onshore wind | 580 MW | Operating | 2018 |
| 4 | Zafarana wind farm | Onshore wind | 546 MW | Operating | 2000 |
| 5 | Amunet wind farm | Onshore wind | 502 MW | Operating | 2025 |
| 6 | Abydos Kom Ombo solar farm | Solar PV | 500 MW | Operating | 2024 |
| 7 | New Fars solar farm | Solar PV | 500 MW | Operating | 2024 |
| 8 | Benban Scatec solar farm | Solar PV | 390 MW | Operating | 2019 |
| 9 | Aswan I hydroelectric plant | Hydropower | 322 MW | Operating | 1960 |
| 10 | Aswan II hydroelectric plant | Hydropower | 270 MW | Operating | 1985 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Renergy Sinia solar farm | Solar PV | 15.0 GW | Announced | 2030 |
| 2 | China Electric solar farm | Solar PV | 10.0 GW | Announced | not recorded |
| 3 | ACWA wind farm | Wind (type not stated) | 10.0 GW | Under construction | not recorded |
| 4 | Masdar -Infinity wind farm | Onshore wind | 10.0 GW | Announced | not recorded |
| 5 | West Sohag wind farm | Onshore wind | 5.0 GW | Announced | not recorded |
Questions
How much renewable energy capacity does Egypt have?
Egypt has 9.5 GW of operating renewable capacity across 90 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Egypt?
Solar PV, with 3.5 GW operating, which is 37% of Egypt's operating renewable capacity in the data.
What share of Egypt's power capacity is renewable?
15% of the operating capacity in this dataset (9.5 GW of 64.0 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Egypt building renewables?
Operating plants that started from 2015 to 2025 total 6.0 GW, and the biggest single year in the data is 1967 with 2.1 GW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Egypt?
Aswan High Dam hydroelectric plant, a hydropower plant of 2.1 GW, which started operating in 1967.
How much renewable capacity is being built or planned in Egypt?
19.6 GW is under construction and 79.8 GW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.