Renewable energy in Cambodia

Cambodia has 1.9 GW of operating renewable capacity in the data, across 33 plants. Hydropower is the largest source at 1.3 GW (69% of the total). That is 45% of the 4.1 GW of operating power capacity of all kinds that the same tracker lists for Cambodia (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 1.3 GW, which is 70% of today's operating renewable capacity. A further 230 MW is under construction and 5.1 GW is announced or in pre-construction.

Operating
1.9 GW33 plants
Share of capacity in this dataset
45%of 4.1 GW operating, all kinds
Started 2015 to 2025
1.3 GWoperating plants
Pipeline
5.3 GW230 MW building, 5.1 GW announced

Capacity by technology

Renewable capacity in Cambodia by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV516 MW2528%0580 MW
Onshore wind000.0%0250 MW
Hydropower1.3 GW669%230 MW4.2 GW
Bioenergy61 MW23.3%062 MW
All renewables1.9 GW33100%230 MW5.1 GW

Of the operating solar, 51 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW250 MW500 MW19901995200020052010201520202025
Solar PVHydropowerBioenergy
Show the figures as a table
Operating renewable capacity in Cambodia by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
2011194 MW0000194 MW000
2013326 MW0000326 MW000
2015378 MW0000378 MW000
2017420 MW20 MW000400 MW000
20187 MW7 MW0000000
201910 MW10 MW0000000
2020197 MW197 MW0000000
2021124 MW124 MW0000000
2022163 MW154 MW000009 MW0
20255 MW5 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 52 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2017 with 420 MW.

Largest renewable plants in Cambodia

The ten largest operating renewable plants in Cambodia.
#PlantTechnologyCapacityStatusStarted
1Lower Sesan 2 hydroelectric plantHydropower400 MWOperating2017
2Stung Tatay hydroelectric plantHydropower246 MWOperating2015
3Russei Chrum Krom Upper hydroelectric plantHydropower206 MWOperating2013
4Kamchay hydroelectric plantHydropower194 MWOperating2011
5Russei Chrum Krom Lower hydroelectric plantHydropower132 MWOperating2015
6Stung Atay hydroelectric plantHydropower120 MWOperating2013
7Cambodia National Solar ParkSolar PV100 MWOperating2022
8Pursat solar farmSolar PV90 MWOperating2020
9Kampong Speu solar farmSolar PV80 MWOperating2020
10Battambang solar farmSolar PV60 MWOperating2021

Largest in the pipeline

The five largest renewable projects under construction or announced in Cambodia.
#PlantTechnologyCapacityStatusStarted
1Sambor hydroelectric plantHydropower2.6 GWAnnouncednot recorded
2Stung Treng hydroelectric plantHydropower1.4 GWAnnouncednot recorded
3Prey Veng (CEEC) solar farmSolar PV250 MWAnnouncednot recorded
4Pursat solar farmSolar PV150 MWAnnouncednot recorded
5Mondulkiri (HK OASIS) wind farmOnshore wind150 MWAnnouncednot recorded

Questions

How much renewable energy capacity does Cambodia have?

Cambodia has 1.9 GW of operating renewable capacity across 33 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Cambodia?

Hydropower, with 1.3 GW operating, which is 69% of Cambodia's operating renewable capacity in the data.

What share of Cambodia's power capacity is renewable?

45% of the operating capacity in this dataset (1.9 GW of 4.1 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Cambodia building renewables?

Operating plants that started from 2015 to 2025 total 1.3 GW, and the biggest single year in the data is 2017 with 420 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Cambodia?

Lower Sesan 2 hydroelectric plant, a hydropower plant of 400 MW, which started operating in 2017.

How much renewable capacity is being built or planned in Cambodia?

230 MW is under construction and 5.1 GW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.