Renewable energy in Azerbaijan
Azerbaijan has 1.6 GW of operating renewable capacity in the data, across 23 plants. Hydropower is the largest source at 1.2 GW (76% of the total). That is 18% of the 8.7 GW of operating power capacity of all kinds that the same tracker lists for Azerbaijan (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 536 MW, which is 34% of today's operating renewable capacity. A further 481 MW is under construction and 4.3 GW is announced or in pre-construction.
- Operating
- 1.6 GW23 plants
- Share of capacity in this dataset
- 18%of 8.7 GW operating, all kinds
- Started 2015 to 2025
- 536 MWoperating plants
- Pipeline
- 4.7 GW481 MW building, 4.3 GW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 304 MW | 14 | 19% | 445 MW | 1.5 GW |
| Onshore wind | 50 MW | 1 | 3.1% | 0 | 721 MW |
| Offshore wind | 0 | 0 | 0.0% | 0 | 2.0 GW |
| Hydropower | 1.2 GW | 7 | 76% | 36 MW | 0 |
| Bioenergy | 37 MW | 1 | 2.3% | 0 | 0 |
| All renewables | 1.6 GW | 23 | 100% | 481 MW | 4.3 GW |
Of the operating solar, 54 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2000 | 150 MW | 0 | 0 | 0 | 0 | 150 MW | 0 | 0 | 0 |
| 2012 | 37 MW | 0 | 0 | 0 | 0 | 0 | 0 | 37 MW | 0 |
| 2014 | 25 MW | 0 | 0 | 0 | 0 | 25 MW | 0 | 0 | 0 |
| 2015 | 20 MW | 20 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2017 | 8 MW | 8 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2018 | 68 MW | 18 MW | 0 | 50 MW | 0 | 0 | 0 | 0 | 0 |
| 2019 | 8 MW | 8 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2021 | 13 MW | 13 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2023 | 230 MW | 230 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2024 | 187 MW | 5 MW | 0 | 0 | 0 | 182 MW | 0 | 0 | 0 |
| 2025 | 3 MW | 3 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1954 with 424 MW.
Largest renewable plants in Azerbaijan
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Mingechevir hydroelectric plant | Hydropower | 424 MW | Operating | 1954 |
| 2 | Shamkir hydroelectric plant | Hydropower | 380 MW | Operating | 1983 |
| 3 | Garadagh Solar PV Plant | Solar PV | 230 MW | Operating | 2023 |
| 4 | Yenikend hydroelectric plant | Hydropower | 150 MW | Operating | 2000 |
| 5 | Khudafarin (Khoda Afarin) hydroelectric plant | Hydropower | 102 MW | Operating | 2024 |
| 6 | Gyz Galasy hydroelectric plant | Hydropower | 80 MW | Operating | 2024 |
| 7 | Yeni Yashma wind farm | Onshore wind | 50 MW | Operating | 2018 |
| 8 | Sarsang hydroelectric plant | Hydropower | 50 MW | Operating | 1976 |
| 9 | Balakhani power station | Bioenergy | 37 MW | Operating | 2012 |
| 10 | Shamkirchay hydroelectric plant | Hydropower | 25 MW | Operating | 2014 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Azerbaijan Caspian Sea wind farm | Offshore wind | 2.0 GW | Announced | not recorded |
| 2 | Nakhchivan (A-Z Czech Engineering) solar farm | Solar PV | 500 MW | Announced | not recorded |
| 3 | Bilasuvar solar farm | Solar PV | 445 MW | Under construction | not recorded |
| 4 | Neftchala solar farm | Solar PV | 315 MW | Announced | not recorded |
| 5 | Khizi-Absheron wind farm | Onshore wind | 241 MW | Announced | 2026 |
Questions
How much renewable energy capacity does Azerbaijan have?
Azerbaijan has 1.6 GW of operating renewable capacity across 23 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Azerbaijan?
Hydropower, with 1.2 GW operating, which is 76% of Azerbaijan's operating renewable capacity in the data.
What share of Azerbaijan's power capacity is renewable?
18% of the operating capacity in this dataset (1.6 GW of 8.7 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Azerbaijan building renewables?
Operating plants that started from 2015 to 2025 total 536 MW, and the biggest single year in the data is 1954 with 424 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Azerbaijan?
Mingechevir hydroelectric plant, a hydropower plant of 424 MW, which started operating in 1954.
How much renewable capacity is being built or planned in Azerbaijan?
481 MW is under construction and 4.3 GW is announced or in pre-construction. Some announced projects will never be built.
Does Azerbaijan have offshore wind?
Yes: 0 MW operating, 0 MW under construction and 2.0 GW announced or in pre-construction.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.