Renewable energy in Afghanistan

Afghanistan has 439 MW of operating renewable capacity in the data, across 15 plants. Hydropower is the largest source at 354 MW (81% of the total). That is 62% of the 706 MW of operating power capacity of all kinds that the same tracker lists for Afghanistan (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 204 MW, which is 47% of today's operating renewable capacity. A further 123 MW is under construction and 564 MW is announced or in pre-construction.

Operating
439 MW15 plants
Share of capacity in this dataset
62%of 706 MW operating, all kinds
Started 2015 to 2025
204 MWoperating plants
Pipeline
687 MW123 MW building, 564 MW announced

Capacity by technology

Renewable capacity in Afghanistan by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV85 MW1019%80 MW0
Onshore wind000.0%43 MW157 MW
Hydropower354 MW581%0407 MW
All renewables439 MW15100%123 MW564 MW

Of the operating solar, 17 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW50 MW100 MW19901995200020052010201520202025
Solar PVHydropower
Show the figures as a table
Operating renewable capacity in Afghanistan by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
201512 MW12 MW0000000
201642 MW000042 MW000
20172 MW2 MW0000000
201936 MW36 MW0000000
20202 MW2 MW0000000
2022100 MW0000100 MW000
202411 MW11 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1967 with 160 MW.

Largest renewable plants in Afghanistan

The ten largest operating renewable plants in Afghanistan.
#PlantTechnologyCapacityStatusStarted
1Kajaki 2 hydroelectric plantHydropower100 MWOperating2022
2Naghlu hydroelectric plantHydropower94 MWOperating1967
3Mahipar hydroelectric plantHydropower66 MWOperating1967
4Kajaki 1 hydroelectric plantHydropower52 MWOperating1975
5Salma hydroelectric plantHydropower42 MWOperating2016
6Naghlu solar farmSolar PV23 MWOperating2026
7Daman (Afghanistan) solar projectNCSolar PV14 MWOperating2019
8Kandahar (77) solar farmSolar PV12 MWOperating2015
9Kandahar (Zularistan) solar farmSolar PV12 MWOperating2019
10Kandahar solar farmSolar PV10 MWOperating2019

Largest in the pipeline

The five largest renewable projects under construction or announced in Afghanistan.
#PlantTechnologyCapacityStatusStarted
1Baghdara hydroelectric plantHydropower227 MWAnnouncednot recorded
2Sarobi 2 hydroelectric plantHydropower180 MWAnnouncednot recorded
3Herat wind farmOnshore wind157 MWAnnouncednot recorded
4Herat wind farmOnshore wind43 MWUnder constructionnot recorded
5Balkh solar farmSolar PV40 MWUnder constructionnot recorded

Questions

How much renewable energy capacity does Afghanistan have?

Afghanistan has 439 MW of operating renewable capacity across 15 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Afghanistan?

Hydropower, with 354 MW operating, which is 81% of Afghanistan's operating renewable capacity in the data.

What share of Afghanistan's power capacity is renewable?

62% of the operating capacity in this dataset (439 MW of 706 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Afghanistan building renewables?

Operating plants that started from 2015 to 2025 total 204 MW, and the biggest single year in the data is 1967 with 160 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Afghanistan?

Kajaki 2 hydroelectric plant, a hydropower plant of 100 MW, which started operating in 2022.

How much renewable capacity is being built or planned in Afghanistan?

123 MW is under construction and 564 MW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.