Renewable energy in Timor-Leste

The data holds no operating renewable plants for Timor-Leste. A further 0 MW is under construction and 122 MW is announced or in pre-construction.

Operating
None recorded0 plants
Share of capacity in this dataset
Not recordedof 255 MW operating, all kinds
Started 2015 to 2025
None recordedoperating plants
Pipeline
122 MW0 MW building, 122 MW announced

Capacity by technology

Renewable capacity in Timor-Leste by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV00n/a072 MW
Onshore wind00n/a050 MW
All renewables0 MW0n/a0 MW122 MW

The build-out by year

No start years are recorded for operating plants in Timor-Leste.

Largest renewable plants in Timor-Leste

No operating renewable plants are recorded.

Largest in the pipeline

The five largest renewable projects under construction or announced in Timor-Leste.
#PlantTechnologyCapacityStatusStarted
1Manatuto solar farmSolar PV72 MWAnnouncednot recorded
2Lariguto wind farmOnshore wind50 MWAnnouncednot recorded

Questions

How much renewable energy capacity does Timor-Leste have?

The data holds no operating renewable plants for Timor-Leste. Pipeline: 122 MW.

How much renewable capacity is being built or planned in Timor-Leste?

0 MW is under construction and 122 MW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.