Renewable energy in Northern Mariana Islands
The data holds no operating renewable plants for Northern Mariana Islands. A further 0 MW is under construction and 28 MW is announced or in pre-construction.
- Operating
- None recorded0 plants
- Share of capacity in this dataset
- Not recordedof 0 MW operating, all kinds
- Started 2015 to 2025
- None recordedoperating plants
- Pipeline
- 28 MW0 MW building, 28 MW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 0 | 0 | n/a | 0 | 28 MW |
| All renewables | 0 MW | 0 | n/a | 0 MW | 28 MW |
The build-out by year
No start years are recorded for operating plants in Northern Mariana Islands.
Largest renewable plants in Northern Mariana Islands
No operating renewable plants are recorded.
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Saipan solar farm | Solar PV | 20 MW | Announced | not recorded |
| 2 | Tinian solar farm | Solar PV | 5 MW | Announced | not recorded |
| 3 | Rota solar farm | Solar PV | 3 MW | Announced | not recorded |
Questions
How much renewable energy capacity does Northern Mariana Islands have?
The data holds no operating renewable plants for Northern Mariana Islands. Pipeline: 28 MW.
How much renewable capacity is being built or planned in Northern Mariana Islands?
0 MW is under construction and 28 MW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.